loading

Gester Instruments | Professional Textile Testing Equipment Manufacturers Since 1997


Test Standard
Test Standard

Interpretation of the steps of laboratory construction planning and construction process

The construction of a professional laboratory is not just a simple combination of equipment and furniture, it is a complex system engineering and a construction with strict requirements for the working environment. What are the laboratory construction steps? The laboratory design company will carry out laboratory construction according to the following steps. 1. Laboratory construction planning The laboratory construction planning includes the appearance, style, height, layout, etc.; before the construction of the laboratory, it is necessary to understand the needs of customers and the future development direction and combine the laboratory construction experience of other related industries to be unified and reasonable. planning. 2. The laboratory plan design uses professional means to carry out the process of concrete realization of the plan roots, including laboratory design, installation, commissioning, maintenance and upgrades. 3. Selection of laboratory construction unit The laboratory design and construction unit should choose a domestic enterprise with a certain scale. The company's strength and level must be strictly inspected, and it is best to inspect its completed successful cases and the location of the company on the spot. 4. The design of the laboratory layout. The layout design stage of the laboratory should consider the needs of work and development as much as possible, rationally allocate the space, and optimize the integration as much as possible. The complete layout of the laboratory can ensure the subsequent professional design of water, electricity, and wind. 5. Laboratory power distribution system The power distribution system of the laboratory is designed according to the specific requirements of the experimental instruments and equipment, through the comprehensive design of professional designers. Because the requirements of laboratory equipment for circuits are more complex, the design of the power distribution system should not only consider the existing equipment and equipment, but also consider the development direction of the laboratory in recent years, and fully consider the reservation of the power distribution system. And circuit maintenance and other issues. 6. Laboratory air-conditioning system The air-conditioning system not only controls the temperature and humidity of the laboratory, but also should cooperate with the laboratory ventilation system to truly and effectively ensure the effect of laboratory construction. 7. Laboratory fire-fighting system The laboratory's requirements for fire-fighting are higher than those of ordinary places. The laboratory design should adopt different fire-fighting measures in accordance with specific conditions to ensure the fire safety of the laboratory. 8. The pipes of the drainage system of the laboratory's water supply and drainage system should be resistant to acid and alkali corrosion and the melting of materials by organic reagents. PPR or other materials should be used instead of ordinary PVC pipes. At the same time, it should be based on the nature, flow, and discharge of sewage. The plan is determined according to the law and combined with outdoor drainage conditions. 9. Laboratory gas supply system The operation of many equipment in the laboratory requires a variety of gas supplies, and the safety of the gas cylinder room must be guaranteed. 10. Laboratory ventilation and exhaust system The design of the laboratory's air supply and exhaust system affects the entire environment and the health of laboratory personnel, and the operation and maintenance of laboratory equipment. 11. The choice of laboratory furniture The choice of laboratory furniture should first consider that it can fully meet the needs of the work, which mainly involves elements such as tabletop material, cabinet structure and material, and color matching. 12. Laboratory interior decoration details During laboratory decoration, do not adopt a large overall structure for the ceiling, which will cause hidden dangers to subsequent construction and maintenance. Floor-to-ceiling glass curtain wall design can be used on both sides of the visiting corridor or large instrument room, which is more transparent and bright, which is convenient for management and visit.

GET IN TOUCH WITH Us
recommended articles
Heat Contact Machine GT-C101-The Ultimate Selection Guide

The Heat Contact Machine GT-C101 is a specialized testing instrument designed for evaluating the heat resistance and thermal protective performance of gloves, protective clothing, and other heat-resistant materials used in high-temperature environments. In industries such as smelting, casting, welding, and glass manufacturing, workers are frequently exposed to intense heat, making accurate testing of contact heat resistance essential for ensuring safety and compliance.

GT-C101 simulates real working conditions by measuring heat transfer delay and thermal transmission under instant contact with high-temperature surfaces. Fully compliant with EN 407, EN 702, and ISO 12127-1 standards, this machine provides precise, repeatable data for manufacturers, laboratories, and research institutions. With high-temperature capability up to 500°C, advanced calorimetry, digital monitoring, and adjustable contact speed, the Heat Contact Machine GT-C101 is an indispensable tool for developing and certifying next-generation PPE and heat-insulation materials.
Everything You Need to Know About Programmable Temperature Humidity Chamber
A Programmable Temperature Humidity Chamber simulates environmental conditions to test product durability, stability (like shelf life & ageing), and performance across materials, electronics, automotive parts, food, and pharmaceuticals. This guide explains its five core systems (Control, Refrigeration, Heating, Humidity, Air Circulation) and their functions for precise testing.
Welcom UK Client Visits GESTER: A Journey of Partnership
GESTER specializes in R&D and production of advanced textile testing equipment, covering fabric, yarn, color fastness, and flammability tests. Our UK client visit highlights our commitment to quality, customization, and efficient service, reinforcing trust for long-term partnerships.
Pilling Box ICI Pilling and Snagging Tester GT-C18: Your Essential Guide
The Pilling Box ICI Pilling and Snagging Tester GT-C18 is an essential tool for evaluating the surface pilling and snagging properties of textiles. This machine adheres to international standards like EN ISO 12945-1 and BS 5811, making it a trusted choice for manufacturers and quality control experts. With features like a user-friendly design, flexible configurations, and durable construction, the GT-C18 delivers precise, reliable testing results. The machine's wide range of accessories, includi
What are The Flame Retardant Test Methods ?
Flame retardant testing evaluates materials' ability to resist ignition and slow fire spread. This guide covers key textile test methods (45°, horizontal, vertical), standards (ASTM, ISO, BS), and equipment like flammability testers for upholstery, carpets, and fabrics.
Installation Training for the Incline Impact Tester GT-N49
Our expert team provides comprehensive on-site installation and training for the Incline Impact Tester GT-N49. This critical packaging testing equipment simulates real-world impacts during handling, transport, and stacking to evaluate product damage resistance. Learn about its key features like flexible moving plates, height adjustment, pneumatic angle control, and remote operation safety. Our service ensures proper setup, operational mastery, maintenance guidance, and troubleshooting support fo
What is The Test for Bond Strength?
The GT-N25 Bond Strength Tester evaluates interlayer bonding in paper, cardboard & composites (e.g., aluminum foil films). Ensures durability & quality compliance with GB/T, ASTM & TAPPI standards.
Understanding the Operation of Crush Tester
Crush Testers, such as the GT-N09, are essential tools in the packaging industry for evaluating the compressive strength of materials like cardboard and corrugated boards. This guide provides a detailed overview of testing methods like Edge Crush Test (ECT), Ring Crush Test (RCT), Flat Crush Test (FCT), Concora Medium Test (CMT), and Pin Adhesion Test (PAT). It also includes a step-by-step operation procedure for the GT-N09 Crush Tester and key precautions to ensure accurate and reliable test re
An Introduction to Footwear Electric Shock Resistant Tester GT-KB42
The GT-KB42 Footwear Electric Shock Resistant Tester by GESTER assesses the dielectric strength of safety shoes, boots, and insulating footwear to prevent workplace electrical hazards. Complying with ANSI, CSA, GB, and ASTM standards, it features precision voltage control, real-time leakage monitoring, and multi-standard compatibility—ideal for power utilities, construction, and industrial safety applications.
How to Conduct Whole Shoes Flexing Tester: Step-by-Step Process
This article explores the Whole Shoes Flexing Tester, focusing on its operation, applications, and features. It offers a detailed, step-by-step guide to help you conduct shoe flexing tests efficiently while improving the durability and performance of footwear products.
no data
QUANZHOU GESTER INTERNATIONAL CO.,LTD gains certificates of ISO 9001, 3A and SGS Audited supplier etc. with advanced design concept, excellent manufacturing technology and strict quality control.
WeChat

Contact us
Tel: +86-595-28886108 
Fax: +86-595-22515221
E-mail: sales10@gester-instruments.com,
                 info@gester-instruments.com
Mobile/Whatapp/ Wechat:  
             + 86 018059983973
Address:  Block 402,4th floor, f buliding, shengfulan business Center, no.577 jitai road, economic and  Technological development zone quanzhou of fujian.China.
Customer service
detect